Smart-contract developers often need to deploy their contracts with consistent addresses across various Ethereum Virtual Machine (EVM) networks. At Merkl, like many other protocols, this ensures users can interact with the same contract address on each network where the protocol is deployed.

In this article, we'll examine various techniques to deploy smart contracts at deterministic addresses.

The original CREATE opcode

The CREATE opcode (a low-level instruction executed by the EVM) is the traditional method used to deploy a smart contract on EVM networks. It can be invoked by an externally owned account (EOA) or a contract to deploy a new contract.

Address calculation: the address of the new deployed contract is calculated as follows (find out more here):

address = keccak256(rlp([sender_address,sender_nonce]))[12 :] The address is a function of senderAddress and nonce , where:

  • senderAddress is the address of the account deploying the contract (an EOA or a smart-contract)
  • nonce is the number of transactions or contracts previously sent or created by the sender.

At Merkl, we typically use this opcode to deploy our contract implementation from the same EOA across multiple networks, ensuring that the EOA has never previously sent transactions across the network.

While this method offers some predictability, it's not ideal for cases where a contract needs to be deployed at the same address on different chains without depending on previous state or nonce values.

The skinny CREATE2 opcode

CREATE2 was introduced in EIP-1014 as an improvement over the CREATE opcode, offering more control and determinism in contract deployment.

Address Calculation: the address for a contract deployed via CREATE2 is determined by the following formula (find out more here):

initialisation_code = memory[offset:offset+size] address = keccak256(0xff + sender_address + salt + keccak256(initialisation_code))[12:]

  • 0xff is a single byte constant,
  • senderAddress is the address initiating the contract deployment,
  • salt is a user-defined value (often a random or unique string that ensures uniqueness),
  • initialisation_code is the result from compiling the contract source code, along with any constructor arguments encoded into it. Any modification, even a single whitespace in the Solidity code will result in a different bytecode.

Using a salt , developers can control where the contract is deployed by providing a predictable identifier. As long as the same values for senderAddress , salt , and initialisation_code are used, developers can deploy a contract at the same address on different chains.

Unlike CREATE , developers can deploy contracts to predetermined addresses, regardless of the sender's nonce. This opcode makes the contract address entirely deterministic.

The multichain alternative CREATE3

CREATE3 is a proposal introduced in EIP-3171 that extends both features of CREATE and CREATE2 . Though the proposal was closed due to inactivity, 0xsequence implemented a workaround until it eventually gets merged.

Address Calculation: The address is no longer tied to the implementation code, allowing a contract to be deployed at the same address using only the senderAddress and a salt as arguments.

Capture d’écran 2025-02-18 à 11.35.13

As shown in the code snippet above, it:

  • first deploys a proxy using CREATE2
  • then calls the proxy with the init code, which deploys the contract using CREATE , thus the deployed contract address only depends on the senderAddress and the salt .

Since it doesn't rely on the contract bytecode, CREATE3 allows contracts to be deployed at the same address even with different constructor arguments and initialization bytecode, making it more suitable for multi-chain setups than CREATE2 .

Deterministic smart contract deployment on EVM-compatible chains offers substantial benefits in terms of control, predictability, and flexibility. From the basic CREATE opcode to more sophisticated methods like CREATE2 and CREATE3 , developers now have more options to deploy contracts at specific addresses with confidence.

Special mention to CREATEX, a factory smart-contract deployed on more than 130 chains today. As mentioned in their README.md, their factory is "a special smart contract that is used to create and deploy other smart contracts on EVM-compatible blockchains using contract creation opcodes", including CREATE , CREATE2 , CREATE3 .